System Test Plan
Table of Contents
- Introduction
- Objectives
- Scope
- Test Strategy
- Test Plan
- Test Schedule
- Resources
- Roles and Responsibilities
- Defect Management
- Risk Management
- Communication Plan
- Approval
Introduction
This document outlines the system test plan for the implementation of Two-Factor Authentication (2FA) in our system. The purpose is to define the strategies and processes that will be used to validate the successful implementation of 2FA.
Objectives
The primary objective of this system test plan is to ensure that the 2FA implementation meets the required security standards and functions correctly. This includes verifying that users can successfully authenticate using both their primary and secondary authentication factors.
Scope
The scope of the system testing includes the following functionalities:
- User enrollment in 2FA
- Generation and delivery of the second authentication factor
- Verification of the second authentication factor
- User experience during the authentication process
- System response to incorrect or expired authentication factors
- Integration with existing authentication mechanisms
Test Strategy
The overall test strategy will include the following types of testing:
- Functional Testing: To verify that the 2FA functionalities work as intended.
- Usability Testing: To ensure that the user experience is smooth and intuitive.
- Security Testing: To validate that the 2FA implementation meets security standards.
- Performance Testing: To ensure that the 2FA process does not degrade system performance.
Test Plan
Test Environment
The testing environment will comprise:
- Hardware: Standard user devices (smartphones, laptops, desktops)
- Software: Operating systems (Windows, macOS, iOS, Android), web browsers, and any required applications
- Network Configurations: Secure network connections, VPNs if necessary
- Other Components: 2FA service providers, email/SMS gateways for delivering the second factor
Test Criteria
- Entry Criteria:
- Test environment is set up and configured.
- Test cases and test data are prepared.
- All dependent systems are operational.
- Exit Criteria:
- All test cases have been executed.
- All critical and high-severity defects are resolved.
- Test summary report is prepared and reviewed.
Test Deliverables
- Test cases and test scripts
- Test data
- Test execution logs
- Defect reports
- Test summary report
Test Schedule
Activity |
Start Date |
End Date |
Test Planning |
12/05/2024 |
12/10/2024 |
Test Case Development |
12/11/2024 |
12/17/2024 |
Test Environment Setup |
12/18/2024 |
12/20/2024 |
Test Execution |
12/21/2024 |
12/31/2024 |
Defect Resolution |
01/02/2025 |
01/10/2025 |
Test Closure |
01/11/2025 |
01/13/2025 |
Resources
- Test Manager
- Test Lead
- Test Engineers
- Developers
- Business Analyst
- Testing tools and software
Roles and Responsibilities
Role |
Responsibility |
Test Manager |
Oversee the testing process, manage resources, and ensure adherence to the test plan |
Test Lead |
Coordinate testing activities and manage the test team |
Test Engineer |
Design and execute test cases, report defects |
Developer |
Fix defects and provide technical support |
Business Analyst |
Ensure test cases align with business requirements |
Defect Management
Defects will be recorded in a defect tracking system. The process includes:
- Logging the defect with detailed information
- Assigning severity and priority
- Tracking the defect status
- Retesting and closing the defect once resolved
Risk Management
Potential risks and mitigation strategies:
- Risk: Delays in test environment setup
- Mitigation: Pre-plan and allocate additional resources if required
- Risk: Incomplete requirements leading to gaps in test cases
- Mitigation: Regular review meetings with stakeholders to clarify requirements
Communication Plan
Communication Type |
Audience |
Frequency |
Medium |
Owner |
Status Report |
Project Team |
Weekly |
Email |
Test Manager |
Defect Review Meeting |
Key Stakeholders |
Bi-weekly |
Meeting |
Test Lead |
Test Summary Report |
All Stakeholders |
End of Testing Phase |
Document |
Test Manager |
Approval
- Prepared by: Mike Meier
- Email: mikemeier@mad-tech.ai
- Date: 12/04/2024
- Approved by: [Approver's Name]
- Date: [Approval Date]