System Test Plan
Table of Contents
- Introduction
- Objectives
- Scope
- Test Strategy
- Test Plan
- Test Schedule
- Resources
- Roles and Responsibilities
- Defect Management
- Risk Management
- Communication Plan
- Approval
Introduction
The purpose of this document is to outline the System Test Plan for the project "Install 2FA 1." This project aims to install two-factor authentication (2FA) across all our login systems. The document provides a structured approach to testing the implementation to ensure all functionalities work as intended and meet the specified requirements.
Objectives
The primary objective of the system testing is to verify that the 2FA has been successfully integrated into all login systems and is functioning correctly. The testing will ensure:
- The 2FA prompts appear during the login process.
- Users can complete the 2FA process.
- The 2FA mechanism is secure and reliable.
- Existing functionalities are not adversely affected by the 2FA integration.
Scope
The scope of the system testing includes:
- Testing the 2FA functionality across all login systems.
- Verifying the user experience during the login process.
- Ensuring the 2FA works with different devices and browsers.
- Validating the security aspects of the 2FA implementation.
Test Strategy
The test strategy for this project includes:
- Functional Testing: To verify the 2FA functionalities work as expected.
- Compatibility Testing: To ensure 2FA works across various devices and browsers.
- Security Testing: To validate the security of the 2FA implementation.
- Regression Testing: To ensure existing functionalities remain unaffected.
Test Plan
Test Environment
The testing will be conducted in the following environments:
- Hardware: Standard desktops, laptops, and mobile devices.
- Software: Windows, macOS, Android, iOS.
- Browsers: Chrome, Firefox, Safari, Edge.
- Network: Secure corporate network and remote access options.
Test Criteria
- Entry Criteria:
- All 2FA components have been developed and integrated.
- Test environment is set up and configured.
- Test data is prepared.
- Exit Criteria:
- All test cases have been executed.
- All critical and major defects have been resolved.
- Test summary report has been reviewed and approved.
Test Deliverables
The following deliverables will be produced during the testing process:
- Test cases
- Test scripts
- Test data
- Test execution logs
- Defect logs
- Test summary report
Test Schedule
A high-level test schedule is provided below:
- Test Planning: 10/10/2024 - 10/12/2024
- Test Case Development: 10/13/2024 - 10/17/2024
- Test Execution: 10/18/2024 - 10/24/2024
- Defect Resolution: 10/25/2024 - 10/27/2024
- Test Closure: 10/28/2024 - 10/29/2024
Resources
The following resources are required for testing:
- Personnel: Test Manager, Test Lead, Test Engineers, Developers, Business Analyst.
- Tools: Test management tools, defect tracking tools, automated testing tools (if applicable).
- Other Materials: Test data, user credentials, access to test environments.
Roles and Responsibilities
Role |
Responsibility |
Test Manager |
Oversee the testing process, manage resources, and ensure adherence to the test plan |
Test Lead |
Coordinate testing activities and manage the test team |
Test Engineer |
Design and execute test cases, report defects |
Developer |
Fix defects and provide technical support |
Business Analyst |
Ensure test cases align with business requirements |
Defect Management
Defects will be managed through the following process:
- Recording defects in the defect tracking tool.
- Prioritizing defects based on severity and impact.
- Assigning defects to the appropriate developers for resolution.
- Retesting resolved defects to ensure they are fixed.
- Tracking the status of defects until closure.
Risk Management
Potential risks and mitigation strategies include:
- Delayed Deployment: Mitigation: Regular progress tracking and timely communication.
- Inadequate Test Coverage: Mitigation: Thorough review of test cases and requirements.
- Technical Issues: Mitigation: Ensure availability of technical support and backup plans.
Communication Plan
The communication plan for keeping stakeholders informed includes:
Communication Type |
Audience |
Frequency |
Medium |
Owner |
Status Report |
Project Team |
Weekly |
Email |
Test Manager |
Defect Review Meeting |
Key Stakeholders |
Bi-weekly |
Meeting |
Test Lead |
Test Summary Report |
All Stakeholders |
End of Testing Phase |
Document |
Test Manager |
Approval
- Prepared by: Mike Meier
- Email: mikemeier@mad-tech.ai
- Date: 10/10/2024
- Approved by: [Approver's Name]
- Date: [Approval Date]